HomeEncyclopedia › Dholera SIR versus Sanand

Dholera SIR versus Sanand

Greenfield region versus an operating industrial estate

This page covers present versus future, and why it matters for Dholera. Every figure below carries the source it came from and the date it was recorded.

Sanand is an established, operating industrial estate near Ahmedabad with running factories, which makes it a useful reality check against the greenfield promise of Dholera SIR.

Dholera SIR versus Sanand at a glance
DholeraGreenfield region, early stage
SanandOperating GIDC industrial estate
Sanand anchorsauto and electronics manufacturing
Distanceboth in the Ahmedabad orbit
Differencefuture potential vs present output
Words on this page, in plain English
SIR
Special Investment Region. A large area the Gujarat government has set aside for industry under its own 2009 law, with its own planning authority instead of the usual local one.
TP scheme
Town planning scheme. The authority pools all the land in one area, lays out the roads and services, then hands each owner back a smaller but serviced plot.
DSIRDA
The statutory authority that plans and regulates Dholera SIR, in place of a municipal corporation.
DICDL
The company that actually builds Dholera. Gujarat holds 51% of it and the central government holds 49% through the NICDC Trust.
NICDC
The central agency that runs India's industrial corridor programme, which Dholera sits inside.
DMIC
The Delhi-Mumbai Industrial Corridor, the national industrial corridor programme Dholera is a node of.
GUJRERA
Gujarat's property regulator. A plotted project that has to register with it gets a number you can look up on the regulator's own website.

Present versus future

Sanand grew around Gujarat Industrial Development Corporation estates and hosts operating automobile and electronics manufacturing, so it already produces output, jobs and ancillary demand today. Dholera is building the conditions for that kind of activity but is earlier in the cycle. An investor choosing between them is really choosing between present, priced-in activity and future, cheaper but unproven potential. Reported

Why it matters for Dholera

Sanand shows that Gujarat can take industrial land from estate to operating cluster, which is part of why the state's execution reputation supports the Dholera thesis. It also shows that value follows operating factories, so for Dholera the honest signal to track is when its plots move from serviced to occupied. No government source guarantees appreciation, and assured-return claims are marketing rather than fact. Reported

This article follows Dholerapedia's sourcing standard: every figure is tagged Confirmed (government or official), Reported (press or trade) or Unverified (broker), and dated. Anything framed as a future event is labelled a target until a government source confirms it. Where a fact is not reliably available, we say so rather than estimate. See the methodology.

Key facts

These are the core facts for dholera sir versus sanand, written out in full. Each one comes from a source listed at the foot of this page and is current as at the review month.

Dholera SIR in one paragraph

Dholera SIR is a planned industrial city covering about 920 sq km, of which roughly 422 sq km is marked for urban development. That land is being delivered as six town planning schemes, spread over roughly three decades. DSIRDA is the authority that plans and regulates the region, and DICDL is the company that builds it, owned 51% by Gujarat and 49% by the central government through the NICDC Trust. Dholera is the flagship node of the Delhi-Mumbai Industrial Corridor. That is the frame every entry here sits in. The fuller version is in What Dholera SIR is and the master plan.

References

  1. Respective development-authority public pages (CIDCO, APCRDA, NRDA, AITL, GIDC).
  2. NICDC / DMIC programme pages.
Filed under: Comparisons · Gujarat
How to read this entry

This is a reference, so it is written to be checked rather than believed. Each figure is marked Confirmed when a government or official record says it, Reported when the press or trade said it, and Unverified when only a seller says it. Each one carries a date, because Dholera keeps moving and a number that was right last year may not be right now. Anything still in the future is written as a target until a government source confirms it happened, and where a fact is not reliably available we say so instead of guessing.

None of this is legal, tax or investment advice, and no government source promises that land here will rise in value. If you are looking at one specific plot, treat everything on this page as background and confirm that parcel's own GUJRERA registration, title and price yourself before you pay. If a figure here has gone out of date, tell us on the contact page and we will correct it. All the figures gathered in one place are in Dholera in numbers, and the full method is on the methodology page.