This page covers built or operational, under construction, and approved or targeted. Every figure below carries the source it came from and the date it was recorded.
This article summarises the current status of Dholera SIR in 2026, separating what is built from what remains a target.
| Expressway | operational (reported Mar 2026) |
|---|---|
| Airport | ~80% (target Oct 2026) |
| Fab | under construction |
| Solar | ~300 MW live |
| Rail | approved 2026 |
- SIR
- Special Investment Region. A large area the Gujarat government has set aside for industry under its own 2009 law, with its own planning authority instead of the usual local one.
- fab
- A semiconductor fabrication plant. The factory where chips are made.
- TP scheme
- Town planning scheme. The authority pools all the land in one area, lays out the roads and services, then hands each owner back a smaller but serviced plot.
- DSIRDA
- The statutory authority that plans and regulates Dholera SIR, in place of a municipal corporation.
- DICDL
- The company that actually builds Dholera. Gujarat holds 51% of it and the central government holds 49% through the NICDC Trust.
- NICDC
- The central agency that runs India's industrial corridor programme, which Dholera sits inside.
- DMIC
- The Delhi-Mumbai Industrial Corridor, the national industrial corridor programme Dholera is a node of.
Built or operational
The Activation-Area trunk infrastructure is reported complete, the Ahmedabad-Dholera expressway is reported operational from March 2026, and about 300 MW of solar is commissioned. Confirmed
Under construction
The Tata semiconductor fab is past the halfway mark, and the international airport is reported about 80% complete. Reported
Approved or targeted
The semi high-speed rail was approved in May 2026 with a 2030-31 target; the airport targets operations in late 2026; the fab targets first mature-node silicon in late 2026 with commercial production reported later. These are targets, not achievements. No government source guarantees appreciation, and assured-return claims are marketing rather than fact. Where a claim about Dholera is a quantity rather than a status, the index of dated Dholera progress metrics carries each series with its latest reading, its unit and the date it was recorded, so a figure can be checked against when it was actually measured. Reported
This article follows Dholerapedia's sourcing standard: every figure is tagged Confirmed (government or official), Reported (press or trade) or Unverified (broker), and dated. Anything framed as a future event is labelled a target until a government source confirms it. Where a fact is not reliably available, we say so rather than estimate. See the methodology.
Key facts
These are the core facts for dholera current status, written out in full. Each one comes from a source listed at the foot of this page and is current as at the review month.
- Expressway: operational (reported Mar 2026).
- Airport: ~80% (target Oct 2026).
- Fab: under construction.
- Solar: ~300 MW live.
- Rail: approved 2026.
Dholera SIR in one paragraph
Dholera SIR is a planned industrial city covering about 920 sq km, of which roughly 422 sq km is marked for urban development. That land is being delivered as six town planning schemes, spread over roughly three decades. DSIRDA is the authority that plans and regulates the region, and DICDL is the company that builds it, owned 51% by Gujarat and 49% by the central government through the NICDC Trust. Dholera is the flagship node of the Delhi-Mumbai Industrial Corridor. That is the frame every entry here sits in. The fuller version is in What Dholera SIR is and the master plan.
References
- NICDC Delivery Monitoring Unit report, 30 June 2026 (DPIIT).
- DSIRDA Sanctioned Development Plan (project profile).
- Dholera Industrial City Development Ltd, dholera.gujarat.gov.in/about_us.
- Press Information Bureau, Release ID 2260624, 13 May 2026.
This is a reference, so it is written to be checked rather than believed. Each figure is marked Confirmed when a government or official record says it, Reported when the press or trade said it, and Unverified when only a seller says it. Each one carries a date, because Dholera keeps moving and a number that was right last year may not be right now. Anything still in the future is written as a target until a government source confirms it happened, and where a fact is not reliably available we say so instead of guessing.
None of this is legal, tax or investment advice, and no government source promises that land here will rise in value. If you are looking at one specific plot, treat everything on this page as background and confirm that parcel's own GUJRERA registration, title and price yourself before you pay. If a figure here has gone out of date, tell us on the contact page and we will correct it. All the figures gathered in one place are in Dholera in numbers, and the full method is on the methodology page.