The Ahmedabad-Dholera Expressway is a 109 km, four-lane, access-controlled greenfield road built by NHAI to connect Ahmedabad with the Dholera Special Investment Region. It is designed for 120 km/h and is expandable to eight lanes. It was reported inaugurated by the Prime Minister on 31 March 2026 and is operational. Reported travel time from Ahmedabad to Dholera falls to about 40 minutes to about one hour, down from roughly two to two and a quarter hours on the old road. Construction cost is reported at about Rs 3,196 crore, or about Rs 4,373 crore when land is included, the difference being scope. Tolling is via FASTag, though specific rates are not reliably sourced.
The Ahmedabad-Dholera Expressway is a 109 km, four-lane, access-controlled greenfield road built by the National Highways Authority of India (NHAI) to link Ahmedabad with the Dholera Special Investment Region. It is designed for a 120 km/h speed and is built so it can be widened to eight lanes later. It was reported inaugurated by the Prime Minister on 31 March 2026 and is operational, and it is the single change that most reshaped how quickly Dholera can be reached from the city.
Dholerapedia is independent and neutral. We do not sell plots and we quote only sourced figures. Where sources differ, as they do on travel time and cost, we show the range and explain why, rather than pick the most flattering number.
What the expressway is
This is a purpose-built, access-controlled expressway, meaning entry and exit happen only at defined interchanges rather than at every crossing, which is what allows consistent high speeds. It runs 109 km as a greenfield alignment, that is, on a fresh route rather than by widening an existing road. It opened with four lanes and was engineered so it can expand to eight lanes as traffic grows. NHAI is the delivering agency.
How much travel time it saves
Before the expressway, the Ahmedabad-to-Dholera trip on mixed roads took roughly two to two and a quarter hours. Reported figures put the new drive at about 40 minutes to about one hour. Sources vary on the exact number, so the honest way to read it is as a band rather than a single guaranteed figure, and real journey time will always depend on your start point, traffic and the day. The chart below uses reported endpoints of the range.
For the fuller door-to-door comparison, including route options and the distance to the airport, see Ahmedabad to Dholera distance. The expressway is also the fastest current road link to the Dholera International Airport site while the airport itself remains under construction.

Design speed and safety features
The 120 km/h design speed is a road-engineering standard, not a legal limit for drivers, and posted limits and rules apply as signed. Access control is the defining safety and speed feature: because there are no uncontrolled crossings or ribbon development along the carriageway, traffic flows without the constant braking that slows an ordinary highway. The expandability to eight lanes is a planning hedge so the corridor can absorb the growth that Dholera is meant to generate.
What it cost
Two cost figures circulate, and the gap between them is about scope, not disagreement. Construction-only cost is reported at about Rs 3,196 crore. Including land, the figure rises to about Rs 4,373 crore. Both are reported values, so we present them side by side rather than blending them into one headline number.
| Basis | Reported cost | What it includes |
|---|---|---|
| Construction only | ~Rs 3,196 cr | Civil build cost |
| With land | ~Rs 4,373 cr | Build plus land acquisition |
Tolling
The expressway is tolled and uses FASTag, India's electronic toll-collection system, so a working FASTag on the windscreen is the practical requirement for a smooth run. Specific toll rates are not reliably sourced, so Dholerapedia does not publish a per-trip figure. Check the current posted rate at the plaza or on official notices before you rely on any number you see quoted elsewhere.
Why it matters for Dholera
Connectivity is the clearest real-world progress in Dholera so far, and the expressway is the centrepiece. It converts a two-hour-plus journey into something closer to a commute, which changes how the region reads for both industry and residents. It sits alongside the proposed semi-high-speed rail link and the under-construction airport as the three connectivity anchors. When weighing the region overall, the expressway counts as done and live, which is exactly why it carries more weight than projects that are still targets. Our neutral guide on whether Dholera is safe to invest in treats it that way.
Frequently asked questions
How long is the Ahmedabad-Dholera Expressway?
Is the expressway open?
How long does the drive take now?
What is the design speed?
How much did it cost?
Is there a toll?
Dholerapedia. (2026). Ahmedabad-Dholera Expressway: Route, Speed and Travel Time. Retrieved 16 July 2026, from https://dholerapedia.com/ahmedabad-dholera-expressway.htmlSources & references
- Dholerapedia fact pack, 2026 (109 km, 4-lane access-controlled expandable to 8, design speed 120 km/h, NHAI)
- Reported inauguration by PM on 31 March 2026; operational
- Reported travel time ~40 min to ~1 hr, down from ~2 to 2.25 hrs (sources vary)
- Reported cost ~Rs 3,196 cr (construction) vs ~Rs 4,373 cr (with land), differing by scope
- Dholerapedia pillar pages: Ahmedabad to Dholera distance, Dholera airport, Dholera rail connectivity, is Dholera safe to invest
Dholerapedia labels facts by confidence. Figures marked reported or target come from press or announcements and may change; verify anything time sensitive against the official source before acting.